Let's build
the first repeatable
batch.
Tell us what works today and what needs to happen next. We will review the fit before discussing a pilot scope.

Questions before the pilot
What stage should my electronics product be at?
Start with working electronics, a representative sample and a clear description of the intended use. Bring the current hardware and firmware revisions, enclosure status, expected batch and known issues. The initial discussion determines what must be resolved before a pilot.
What batch quantities do you consider?
The initial target range is 10–500 units, subject to technical and commercial review. It is a planning range, not a minimum-order promise or a statement of installed production capacity.
Do I need to buy a complete production line?
No machine purchase is required to start a pilot conversation. The proposed approach begins with the operations your product needs, which may be a single assisted bench with a product-specific fixture.
Does the pilot include PCB fabrication or component assembly?
The current starting point is working electronics. PCB fabrication, component sourcing and board assembly are not automatically included; those requirements need to be identified and scoped separately.
Is product certification included?
No. Product certification is a separate activity. The initial scope focuses on indoor, low-voltage, non-safety-critical electronics, with test coverage and acceptance criteria agreed for the actual product.
What determines the pilot cost and lead time?
Product readiness, part availability, enclosure work, fixture complexity, programming access, test coverage, batch quantity and packaging requirements all affect the scope. A price and schedule can be agreed only after the product is reviewed.
Before you enquire: prepare your pilot checklist.
